Your packaging reorder level is the stock count at which you place the next order: average daily use multiplied by the supplier's lead time in days, plus safety stock for delays and busy weeks. Buying factory-direct, that point comes months before the shelf looks empty.
When we store a customer's stock, we watch the level and tell them when it's time to reorder. This guide shows the sum behind that call, with a real example, so you can check it yourself or set it up for stock you hold.
Key takeaways
- Reorder level = average daily use x lead time in days + safety stock. It's the same thing as a reorder point.
- Work it out per item and per size, because each one runs down at its own rate.
- A factory-direct repeat order takes 3 to 4 months, so plan on the long end and add safety stock on top.
- With a 4-month lead time and a month of safety stock, a year's supply needs reordering about 7 months after it arrives.
- If you switch supplier, keep buying from the old one until the first new delivery has arrived and been checked.
What is a reorder level?
A reorder level is the quantity left in stock that triggers the next order, set so the new stock arrives before the old runs out. Inventory guides call it a reorder level or a reorder point; they mean the same thing.
The formula is short: average daily use, times the lead time in days, plus safety stock. The first part covers what you'll use while you wait for the order. Safety stock covers what can go wrong: a late shipment or a busier month than usual.
How to work out your reorder level in 4 steps
You need three numbers for each item: how many you use a day, how long the supplier takes, and how much buffer you want.
- Pieces a day. Divide a year's use by 365, or multiply orders a day by pieces per order. The packaging cost calculator works out yearly use, and a new shop can start from the takeaway packaging checklist.
- Lead time in days. Count from the day you order to the day the goods are on your shelf, not the day they ship. Use the long end of the range your supplier gives.
- Safety stock. Add a buffer for a late delivery or a busy spell, based on your busiest month's daily use, not the yearly average.
- Mark the level. Write the reorder level for each item where you'll see it: on the shelf, in a stock sheet, or with the supplier who holds your stock.
A worked example: two burger boxes, a year's supply
A one-branch burger shop in Paphos uses two custom burger boxes: about 30,000 of one and 20,000 of the other a year. A repeat order of an approved item takes 3 to 4 months, so we've used 90 and 120 days and assumed the boxes are used evenly through the year.
| Item | Box A | Box B |
|---|---|---|
| Boxes a year | 30,000 | 20,000 |
| Boxes a day (a year's use ÷ 365) | about 82 | about 55 |
| Use during a 90-day lead time | 82 x 90 = 7,380 | 55 x 90 = 4,950 |
| Use during a 120-day lead time | 82 x 120 = 9,840 | 55 x 120 = 6,600 |
| Safety stock: 30 days' use | 82 x 30 = 2,460 | 55 x 30 = 1,650 |
| Reorder level (120 days + 30 days) | 12,300 | 8,250 |
| Reorder after using | 17,700, about 7 months in | 11,750, about 7 months in |
Our arithmetic, from the shop's yearly quantities and our repeat-order lead time. Your numbers will differ.
Two things stand out. First, the reorder level is high: with 12,300 boxes still in stock, it doesn't feel like time to order, but it is. Second, both boxes hit their level at about the same time, because both are ordered as a year's supply. That makes one combined reorder easy to plan.
Why factory-direct lead times change the maths
Factory-direct lead times are measured in months, not days, so the reorder level becomes a large share of the order. If a local wholesaler delivers in 3 days, Box A's reorder level is 82 x 3 = 246 boxes, plus a little safety stock. Factory-direct, it's over 12,000.
The trade-off is price and quantity. A factory-direct minimum is usually 20,000 to 30,000 pieces per item, which lasts a single fast food shop about a year, and the price per piece keeps falling above 20,000. You order once a year at a lower price, and you plan that order months ahead.
A first order takes longer than a repeat: 2 to 4 weeks for samples, then 3 to 4 months for production and shipping. More on minimums and lead times, and on why local is faster but factory-direct needs planning.
Let the stock sit with your supplier
The simplest way to manage a year of boxes is to have the supplier hold it. We store stock in Cyprus and deliver every 1 to 2 weeks, with storage priced into the unit price, so your shelf holds a week or two of boxes, not a year.
When we store your stock, we also watch the level and tell you when it's time to reorder, so the 7-month point doesn't slip past in a busy season. You still decide the quantity and approve the order. How storage and scheduled deliveries work.
Switching supplier without running out
Switching packaging supplier without a gap comes down to one rule: keep buying from your current supplier until the first new delivery has arrived and been checked. With factory-direct, that's about 4 months from first contact:
- Quote: 2 to 3 days after you send a photo of what you use now.
- Samples: free if you go ahead, in about 2 weeks. Test them in your own shop; nothing is made until you approve them.
- Production and shipping: 3 to 4 months.
- First delivery: the Paphos burger shop above took nearly 4 months from first contact to delivery.
So start the switch when you'd normally reorder, and order enough from your current supplier to cover about 5 months. Switch item by item: start with the items you use most, and keep your current supplier for anything that isn't worth switching. When we quote, we tell you which items those are. Before you decide, compare the quotes like for like, and see every step from quote to delivery.
Common questions about reorder levels
Is a reorder level the same as a reorder point?
Yes. Reorder level and reorder point are two names for the same number: the stock count that triggers the next order. Both are worked out as average daily use multiplied by the lead time in days, plus safety stock to cover delays and busier periods than average.
How much safety stock does a takeaway need?
There's no universal figure. Plan on the long end of your supplier's lead time, then add a buffer for a late delivery or a busy spell, based on your busiest month. With a 3 to 4 month factory-direct lead time, 4 months plus a month's buffer puts the reorder point at about 5 months' use.
How long does it take to switch packaging supplier?
To a factory-direct supplier, about 4 months: 2 to 3 days for the quote, 2 to 4 weeks for samples and approval, then 3 to 4 months for production and shipping. Keep your current supplier for that time, and until the first delivery has been checked against the sample.
What happens if a delivery doesn't match the sample?
With us, production is inspected against your approved sample before it ships. If a shipment still doesn't match, the factory remakes the order at no cost to you, and that has already happened. A remake still takes time, which is one more reason to keep safety stock.
Plan your next order with us
Tell us what you use now and roughly how many a year. In 2 to 3 days we'll send a detailed quote with delivered prices, item by item. If we store your stock, we'll watch the level and tell you when to reorder. Get a free quote.